Basic requirements: The artificial turf construction foundation can be divided into three materials, cement concrete foundation, asphalt foundation and lime soil foundation. Before the artificial turf construction, the quality must be checked and accepted by the company. The company will designate a special person to carry out the inspection and acceptance, and form a basic acceptance report. Only qualified can be used for construction.
Construction preparation: prepare the construction plan, report to the company for review, and plan the material usage to ensure the construction quality and construction period.
Construction process: basic treatment, cleaning the site, cleaning the site where the lawn is to be laid, and removing oil, dirt, dirt and other garbage. The area around the site should be kept clean and garbage is strictly prohibited.
For old sites that have been built for a long time, it is necessary to clean the expansion joints and fill in new materials. The adhesive tape is laid, and the adhesive tape is laid in a single layer in a directional arrangement, and each adhesive tape must be spliced and completed. The underlying adhesive tape must be laid flat and free of wrinkles. Both ends of the adhesive tape must be fixed.
Lawn laying: The artificial turf is delivered to the construction site, and the blanking is calculated according to the drawings. Use special tools to lay, level, and trim the lawn. The direction of the grass seedlings must be the same, otherwise it will be easy to produce visual color difference.
Use special joint waterproof glue and adhesive tape to connect the joints of the lawn, and then compact the glue after the glue is produced. After laying the bond, check that it is flat and firm. Mark the surface layer according to the drawing requirements, splicing and verifying.