The concrete paving steps of landscape greening artificial turf are divided into seven major steps. The construction details are marked-sand filling-foundation finishing-lawn finishing-paving-filling with quartz sand-later inspection. The following is a detailed explanation of the artificial turf paving requirements and paving secrets of the greening site.
Step one of paving artificial turf for landscape greening, mark. Excavate the site to be constructed and mark the excavation site; excavate the site according to the scope of the site record.
The second step of paving the artificial turf for landscape greening is the site drainage design. Dig a trench with a depth of 100 mm to allow rainwater to flow out.
Step 3 of paving the artificial turf greening site, filling the site with sand. Spread gravel with a height of 7.5cm and lime or sand with a height of 5cm on the construction site, and spread them evenly around the site. Step four: finishing the site foundation. First, check the flatness of the construction site, and spray water on the basis of the level; then use a rammer to compact the foundation. The purpose of foundation compaction is to ensure that there are no stones protruding from the ground on the site, and the foundation should be lower than the level ground 2 ㎝.
Artificial turf paving step five, artificial turf finishing. Carry the artificial turf into the site and spread it flat on the construction site; then, use a sharp knife to cut off the excess lawn. Of course, in order to make the lawn paving smooth, make sure that the cutting edge of the lawn is straight when cutting.
Landscape greening paving step six, lawn paving. When paving the artificial turf, ensure that the direction of the rolls is the same every time. Between the artificial turf blocks, the paving must be closely connected, and there should be no large gap distance. At the same time, during the paving process of artificial turf, pay attention to roll up the edge of the lawn to both sides, and ensure that the surface of the joint cloth is clean.
In addition, the seam cloth should be put in straight, and the seam cloth should be coated with special glue for artificial turf. In addition, put the lawn on both sides on the seam cloth, and make sure that the seam edge of the lawn is on the center line of the seam cloth; if the artificial turf is glued to the seam cloth during the paving process, you need to use your fingers to The grass threads on both sides of the seam cloth are often straight.
Construction step seven, the secret to beautiful results in landscape artificial turf paving-filling with quartz sand or rubber particles. This is a landscape green lawn that can be filled with quartz sand and rubber particles if the greening site needs to be filled with quartz sand and rubber particles to fix the artificial lawn on the ground; and in order to strengthen the lawn fixing effect, it can be used on the lawn, every 40-50 Fix the ㎝ place with 15㎜ nails.
For landscape green lawns, it is recommended that artificial turf be filled with 6kg of quartz sand. If the effect is needed, the artificial turf can be filled with 1-3Kg of rubber particles, which is much less than the artificial turf of football field, but the effect is very good. After filling the artificial turf filler, comb the grass yarn with a rake to make the direction of the artificial grass yarn consistent and improve the overall appearance of the paving.
ZheJiang Ruopei Arts & Crafts Co., Ltd
Tel: 86-579-8597-7190
Mobile: 86-19905898261
Fax: 86-579-8597-7190
Email: tiffany@ruopeichina.com
Add: No. 10,One Street, Wuhua Road, Heyetang Industrial Zone, Yiwu, Zhejiang, China